How Construction Loans Work When You Buy Land First
A construction loan lets you purchase land and fund the build in stages, with the lender releasing money progressively as construction reaches specific milestones. You only pay interest on the amount drawn down at each stage, not the full loan amount from day one.
The structure differs completely from a standard home loan. Instead of receiving the full loan amount at settlement, funds are held and released according to a progress payment schedule. A valuer inspects the site at each stage to confirm the work matches the claim before the lender releases the next payment. Most lenders charge a progressive drawing fee each time funds are released, typically between $150 and $400 per drawdown depending on the lender.
Consider a buyer purchasing a block in Bulimba for $650,000 with plans to build a $550,000 custom home. The lender approves a total loan amount of $1,200,000 but only advances $650,000 at land settlement. The remaining $550,000 is released in five stages: slab down, frame up, lockup, fixing, and practical completion. At slab stage, the builder invoices $110,000, the valuer confirms the stage is complete, and the lender releases that amount directly to the builder. Interest accrues only on $760,000 at that point, not the full $1,200,000. By lockup, $400,000 has been drawn and interest is charged on $1,050,000. Once construction finishes, the loan converts to a standard home loan structure with principal and interest repayments.
What Lenders Assess Before Approving Land and Construction Finance
Lenders assess your income, deposit, and the project itself before approving a land and construction package. They want to see a fixed price building contract with a registered builder, council approval for the build, and confirmation that the land is suitable for construction without major remediation work.
Your borrowing capacity gets calculated differently than it would for an established property purchase. Lenders factor in the interest-only repayment during construction, but they also assess whether you can afford the full principal and interest repayment once the build completes and the loan converts. If your income can service $1,200,000 on an interest-only basis during construction but not on a principal and interest basis afterwards, the loan won't be approved at that amount.
Ready to get started?
Book a chat with a Finance & Mortgage Broker at LBK Lending today.
The builder matters as much as the borrower. Lenders maintain lists of acceptable builders, and some won't lend against certain volume builders or smaller custom builders without additional scrutiny. The contract needs to be a fixed price contract, not a cost plus arrangement, because lenders want certainty around the final loan amount. A cost plus contract introduces the risk that the final build cost exceeds the approved loan, leaving you unable to complete construction. If you're planning to use a builder outside the major volume builders in Brisbane, confirm with your broker that the lender will accept them before committing to land purchase.
Progress Payment Schedules and How Drawdowns Actually Happen
Most residential construction loans in Queensland release funds across five stages, though some lenders offer six-stage schedules for larger custom builds. The typical breakdown is 10% at base stage, 15% at frame, 35% at lockup, 25% at fixing, and 15% at practical completion, though this varies by lender and builder.
The builder invoices you when a stage is complete. You lodge the invoice and progress claim with your lender, who arranges a progress inspection within a few business days. The valuer attends the site, confirms the stage matches the invoice, and provides a report to the lender. If everything aligns, the lender releases funds directly to the builder within 48 to 72 hours. If the valuer identifies incomplete work or discrepancies, the drawdown is held until the issue is resolved.
Timing becomes critical if the builder has already paid subcontractors and suppliers for that stage. A delayed inspection or disputed claim can create cash flow pressure for the builder, which can flow through to the build timeline. Some builders build the valuer's timeline into their invoicing and expect payment within 14 days of lodging a claim. Others invoice on completion and expect faster turnaround. Understanding your lender's typical inspection and release timeframe before construction starts avoids friction later. Most lenders take between five and ten business days from claim lodgement to funds release, assuming no complications.
How Interest Works During the Construction Period
You make interest-only payments during construction, calculated on the amount drawn down so far. The repayment amount increases each time funds are released for the next stage.
In the earlier example, the buyer starts with $650,000 drawn for the land purchase. At a variable rate, the monthly interest-only repayment sits around $3,250. After the slab stage, the drawn amount increases to $760,000 and the repayment rises to approximately $3,800. By lockup, with $1,050,000 drawn, the repayment reaches roughly $5,250. Once construction completes and the full $1,200,000 is drawn, the repayment switches to principal and interest, which at current variable rates would be around $7,400 per month over 30 years.
Some buyers assume they'll keep paying interest-only after construction finishes, but most construction loans automatically convert to principal and interest repayments once the final drawdown occurs. You can request to stay on interest-only for a period after completion, but that requires lender approval and usually incurs a higher interest rate. Planning your household budget around the post-construction repayment amount rather than the initial interest-only figure avoids problems when the loan converts.
Deposit Requirements and How Much You Actually Need Upfront
Most lenders require a 10% deposit of the total project cost, which includes both land and construction. If you're buying land for $650,000 and building for $550,000, that's a $120,000 deposit on a $1,200,000 project.
The deposit needs to be genuine savings or equity from another property. Gifted funds are accepted by some lenders but usually require a statutory declaration from the person providing the gift confirming it's not a loan that needs to be repaid. If you're using equity from an existing property as your deposit, the lender will assess the current value of that property and allow you to borrow against the available equity, provided your total borrowing doesn't exceed their lending limits.
You also need to cover upfront costs that sit outside the loan amount. These include stamp duty on the land (construction costs aren't subject to stamp duty), conveyancing fees, council approval fees if not already included in your builder's contract, and the lender's application and valuation fees. For a $650,000 land purchase in Queensland, stamp duty is roughly $24,000. Budget another $3,000 to $5,000 for legals, council fees, and lender charges. These costs are typically paid before or at settlement and aren't usually added to the loan.
Building in Bulimba: What Local Buyers Should Know
Bulimba's character housing and heritage overlays mean development applications take longer and cost more than they would in newer suburbs further out. If you're buying an older block with an existing house that needs demolition, factor in demolition costs and the time required for council to process your application.
The suburb's proximity to the river and the 2011 flood history means some blocks require flood-resilient design or elevated floor levels. Lenders will request a flood report as part of their valuation process, and if the land is in a high-risk flood zone, some lenders won't proceed regardless of the building design. Others will lend but require additional insurance or design features that increase construction costs. If you're considering a block near the river or in lower-lying parts of Bulimba, confirm the flood classification and lender appetite before exchanging contracts on the land.
Most of the vacant land in Bulimba sits in pockets near Oxford Street or along the edges closer to Hawthorne and Morningside. Blocks are smaller than those in growth corridors, typically between 400 and 600 square metres, which limits the size and style of home you can build under council setback and site cover rules. A mortgage broker in Bulimba familiar with the area can flag these constraints early and connect you with builders who regularly work within the suburb's planning requirements.
Owner Builder Finance and Why Most Lenders Won't Touch It
If you're planning to manage the build yourself as an owner builder, your finance options shrink dramatically. Most mainstream lenders don't offer owner builder finance because the risk of cost blowouts and incomplete construction is significantly higher without a licensed builder managing the project.
The few lenders who do consider owner builder applications require proof of construction experience, a detailed cost breakdown for every trade and material, and a larger deposit, often 20% to 30% of the total project cost. They'll also cap the loan amount lower than they would for a project with a registered builder, and the interest rate is typically higher.
If you're set on the owner builder path, expect a much longer approval process and be prepared to provide evidence of your construction background or engage a project manager with a building licence. Most buyers find that the additional cost of using a registered builder is offset by the better loan terms and lower risk of delays or disputes with subcontractors.
When to Lock in Your Construction Loan Interest Rate
You can't lock in a fixed rate for the construction period. Lenders only offer variable rates during drawdown because the loan amount changes at each stage and fixing a rate on a progressively drawn loan creates complexity they won't manage.
Once construction completes and the loan converts, you can move to a fixed rate if you want certainty around repayments. Some buyers split the loan at that point, fixing part and leaving part variable, which provides some rate protection while maintaining the flexibility to make additional payments without penalty. If interest rates are rising during your construction period, your repayments will increase each time the lender adjusts the variable rate, in addition to the increases caused by each drawdown.
If you're refinancing an existing property to fund a land and construction package, you might lock that existing loan into a fixed rate before starting the project to stabilise your overall repayment position, but the construction loan itself stays variable until completion. Speak to your broker about refinancing options before committing to the project.
Timeframes and What Happens If Construction Drags On
Most lenders require you to start construction within 6 to 12 months of land settlement, and the build must reach practical completion within 12 to 18 months of starting. If construction stalls or extends beyond that period, the lender may review the loan and require updated valuations or financial information.
Delays happen for plenty of reasons: weather, builder availability, supply shortages, council delays on inspections, or disputes over variations. If your build runs over time, communicate with your lender early. Most will extend the construction period if the delay is reasonable and the builder is still solvent and working on the project. What they won't tolerate is a half-finished build with no activity for months and a builder who's gone silent.
A buyer purchasing land in Bulimba in winter might not start construction until the following spring due to weather and builder scheduling. If the contract allows 12 months to complete and the build starts 9 months after settlement, the total project runs 21 months from land purchase to moving in. Lenders accept this as long as the timeline was disclosed upfront and aligns with the builder's schedule.
Switching from Construction Loan to Standard Home Loan After Completion
The loan converts automatically once the final drawdown is released and practical completion is confirmed. The lender revalues the completed property to confirm it matches or exceeds the total loan amount, then switches the loan structure from construction to a standard home loan with principal and interest repayments.
If the final valuation comes in lower than the amount you've borrowed, the lender may require you to reduce the loan or provide additional security. This rarely happens if the initial land and construction valuation was accurate and the build proceeded to plan, but it can occur if the market drops significantly during the construction period or if the finished home doesn't match the original plans.
Once converted, the loan behaves like any other home loan. You can refinance, access equity, switch between fixed and variable, or make extra repayments depending on the product you're on. Most buyers review their loan structure at this point to ensure it still suits their situation, particularly if their income or family circumstances changed during the build.
If you're weighing up land and construction finance in Bulimba or the surrounding area and want to understand your options before committing to a purchase, call one of our team or book an appointment at a time that works for you.
Frequently Asked Questions
How much deposit do I need to buy land and build in Bulimba?
Most lenders require a 10% deposit of the total project cost, which includes both the land purchase price and the construction cost. You'll also need to cover stamp duty on the land, council fees, and legal costs separately.
Do I pay interest on the full loan amount during construction?
No, you only pay interest on the amount drawn down so far. As each construction stage is completed and funds are released, your interest repayment increases to reflect the new drawn balance.
Can I use a fixed interest rate during the construction period?
No, construction loans are variable during the drawdown period because the loan amount changes at each stage. You can switch to a fixed rate once construction completes and the loan converts to a standard home loan.
What happens if my builder goes into liquidation during construction?
Your lender will freeze further drawdowns and may require you to engage a new builder to complete the work. You'll need to demonstrate how the remaining budget will cover completion, and the lender may require updated valuations.
How long does it take for the lender to release funds at each construction stage?
Most lenders take five to ten business days from when you lodge the progress claim to when funds are released. This includes time for the valuer to inspect the site and confirm the stage is complete.